Asunim土耳其40.3兆瓦光伏电站投入运营

게시됨 2017. 12. 26.
Asunim 
The system consists in two separate sites totalling 40.3MW, built in parallel, one of 19,7MW and another of 20.6MW, both located in Manisa, Turkey.

Asunim connected recently 40,3MW SPP to the grid and add this reference to its EPC and Operation and Maintenance portfolio.

Managing partner of Asunim Turkey, Mr. Umut Gürbüz stated: "Installing a project on a flat terrain is easier when compared to sites with different slopes. In order to get the highest yield several different studies and calculations were made for this challenging project."

The systems feature Jinko Solar high-efficiency (PID free) solar modules and REFUsol 40K string inverters operating without the need for fan cooling and with full IP65 protection against humidity and dust. The German company, Solar-Log was the choice for the SCADA system. Operation and Maintenance activities will be covered by Maxima Energy, affiliate but independent O&M Company of Asunim.


위 기사에 언급한 회사들의 ENF 프로필

Asunim (솔라패널 설치): https://kr.enfsolar.com/asunim
Asunim (판매업체): https://kr.enfsolar.com/asunim
PV industry news is republished free of charge, please send your news to