• 미국
    2013. 4. 1.

    Spire Corporation Reports Results for Fourth-Quarter and Year-End 2012

    Mar. 29, 2013 - Spire Corporation ("Spire") announced today revenues from continuing operations for the year ended December 31, 2012 of $22.1 million, a 64% decrease from $58.7 million in 2011. Net loss for the year ended December 31, 2012 was $1.9 million, or $0.22 per diluted share, compared to a net loss of $1.5 million, or $0.18 per diluted share, for the same period of 2011. These results include a gain on the sale of its Semiconductor business unit of $3.5 million, net of a tax provision of $1.9 million or $0.34 per diluted share in 2012. Fiscal year 2011 net operating results reflect a gain on a settlement with a contract manufacturer of $1.4 million, net of a tax provision of $0.9 million, or $0.16 per diluted share in 2011. In addition, the Company recorded a gain of $0.4 million on a termination of a contract in 2011. 
  • 독일
    2013. 3. 29.

    aleo solar Records a Drop in Revenue and Negative Earnings in Financial Year

    28.03.2013 - aleo solar AG today published its 2012 annual report, confirming the preliminary revenue of EUR 279.9 million announced earlier, which represents a decline of 39 percent compared to the previous year (EUR 461.8 million).
  • 영국
    2013. 3. 29.

    Bentley Factory Goes Green with Large Roof-Top Solar Installation

    28 March 2013 - Bentley Motors today announces that it is installing the UK's largest roof mounted solar panel system. The installation will be owned and operated by Lightsource Renewable Energy Limited.
  • 독일 중국
    2013. 3. 29.

    Gehrlicher Solar to Build 5.3MW Solar Park in a Water Protection Area

    On 20 March, Gehrlicher Solar AG started construction of the Neustadt-Bahn solar park. The location of this construction poses a particular challenge as it is situated in a water protection area. After extensive surveying and elaborate, detailed planning carried out by Gehrlicher Solar AG, one of the first solar parks was approved in an area of this kind in Bavaria and thus the implementation can now quickly proceed.
  • 미국
    2013. 3. 29.

    GT Advanced Technologies and Powertec Energy Corporation Sign Memorandum of Understanding

    March 28, 2013 - GT Advanced Technologies and Powertec Energy Corporation announced today the execution of a memorandum of understanding (MOU), which states Powertec's intention to purchase polysilicon technology and equipment from GT for their phase 2 and 3 expansion projects. Design work for these projects has begun and Powertec currently expects to begin ordering GT equipment and technology in the second half of 2014. 
  • 일본 미국
    2013. 3. 28.

    Linzer Products Reduces Energy Costs with Mitsubishi Electric Photovoltaic System

    March 27, 2013 - Linzer Products Corporation is replacing all the company's electricity needs with clean, solar power at its paint brush factory in San Fernando, California. The recent installation of a 614kW DC photovoltaic (PV) system includes 2,730 Mitsubishi Electric solar modules, installed by Sun Integration. The solar modules stretch across the factory's flat roof, transforming it into a productive space that contributes to the company's bottom line.
  • 스위스
    2013. 3. 28.

    SolarMax Opens a New Location in Chile

    26.03.2013 - Sputnik Engineering is continuing its international expansion by opening a new office in Chile. The Swiss company with its reliance on more than twenty years of experience in the PV inverter production enters the market in Chile, its' first location in Latin America, in response to the growing importance of the photovoltaic market in this region. The branch office located in Santiago de Chile will be headed by Fernando Sánchez, who is also General Manager of the Spanish office, in collaboration with a local commercial director. To date SolarMax is already involved in several Chilean projects to be finalized this year and in 2014. 
  • 그리스
    2013. 3. 28.

    Egnatia Romania Completes Photovoltaic Parks Totaling 10MW

    March 26, 2013 - Egnatia Romania announces that has finalized the works and connected to the national electricity grid, photovoltaic parks in total of 10MW, during December 2012 and January 2013.
  • 일본
    2013. 3. 28.

    Solar Frontier to Restart Miyazaki No. 2 Plant, Considering New Products

    March 27, 2013 – Solar Frontier announced today that it will restart the manufacturing of solar modules at its Miyazaki No.2 Plant in Kiyotakecho, Miyazaki, Japan on July 1, 2013. Production at the 60MW nameplate capacity plant had been temporarily suspended since the end of 2012. Pending the final decision of product models to be manufactured, Solar Frontier is planning to make minor equipment modifications to enable the manufacture of new products that will be sold in Japan.
  • 독일